Dr. Mary E. Kurz
  • Home
  • Bio
  • Team
  • Research
  • Publications
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Flexible Flowline Data Repository

Flexible Flowline Data Repository Research

Improved Mixed-Integer Programming Formulations for the SDST Flexible Flowline Problem

Kurz, Mary E. (presenter). “Improved Mixed-Integer Programming Formulations for the SDST Flexible Flowline Problem.” November 17, 2002. INFORMS 2002 Conference, San Jose CA.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2002-11-17 00:00:002021-06-21 20:54:24Improved Mixed-Integer Programming Formulations for the SDST Flexible Flowline Problem

Effective Heuristics for Flexible Flow Line Scheduling

Kurz, Mary E. (presenter). “Effective Heuristics for Flexible Flow Line Scheduling.” September 10, 2002. DOE Fellows Symposium. Washington DC.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2002-09-10 00:00:002021-06-21 20:54:37Effective Heuristics for Flexible Flow Line Scheduling

Creating Schedules for Flexible Flowlines with Sequence-dependent Setup Times in Random Keys Genetic Algorithms

Pehlivan, Sertac and Mary E. Kurz. “Creating Schedules for Flexible Flowlines with Sequence-dependent Setup Times in Random Keys Genetic Algorithms” Industrial Engineering Research Conference Proceedings 2002, Orlando FL (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2002-06-23 00:00:002021-06-21 20:33:41Creating Schedules for Flexible Flowlines with Sequence-dependent Setup Times in Random Keys Genetic Algorithms

Alternative Formulations for Flexible Flowlines with Sequence-dependent Setup Times

Kurz, Mary E. “Alternative Formulations for Flexible Flowlines with Sequence-dependent Setup Times” Industrial Engineering Research Conference Proceedings 2002, Orlando FL (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2002-06-23 00:00:002021-06-21 20:33:55Alternative Formulations for Flexible Flowlines with Sequence-dependent Setup Times

MIP Formulations for Flexible Flow Line Scheduling

Kurz, Mary E. (presenter) and Ronald G. Askin. “MIP Formulations for Flexible Flow Line Scheduling.” November 5, 2001. INFORMS 2001 Conference, Miami FL.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-11-05 00:00:002021-06-21 20:54:51MIP Formulations for Flexible Flow Line Scheduling

Note on An adaptable problem-space-based search method for flexible flow line scheduling

Kurz, Mary E. and Ronald G. Askin. “Note on An adaptable problem-space-based search method for flexible flow line scheduling.” IIE Transactions, Vol. 33, No.8, August 2001, 691-693.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-08-01 00:00:002021-06-21 19:58:09Note on An adaptable problem-space-based search method for flexible flow line scheduling

Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines

Askin, Ronald G. and Mary E. Kurz. “Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines.” July 30, 2001. International Conference on Production Research, Prague, Czech Republic.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-07-30 00:00:002021-06-21 20:35:21Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines

Scheduling Flexible Flow Lines with Sequence-dependent Setup Times

Kurz, Mary E. and Ronald G. Askin. “Scheduling Flexible Flow Lines with Sequence-dependent Setup Times.” Industrial Engineering Research Conference Proceedings 2001, Dallas TX (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-06-23 00:00:002021-06-21 20:34:42Scheduling Flexible Flow Lines with Sequence-dependent Setup Times

Two Genetic Algorithms for Flexible Flow Line Scheduling

Kurz, Mary E. (presenter) and Ronald G. Askin. “Two Genetic Algorithms for Flexible Flow Line Scheduling.” June 19, 2001. INFORMS 2001 International Conference, Maui HI.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-06-19 00:00:002021-06-21 20:55:06Two Genetic Algorithms for Flexible Flow Line Scheduling

Flexible Flowline Scheduling with Sequence-dependent Setup Times

Kurz, Mary E. (presenter) and Ronald G. Askin. “Flexible Flowline Scheduling with Sequence-dependent Setup Times.” November 6, 2000. INFORMS 2000 Conference, San Antonio TX.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2000-11-06 00:00:002021-06-21 20:55:28Flexible Flowline Scheduling with Sequence-dependent Setup Times
Page 2 of 212

Pages

  • Bio
  • Home
  • Publications
  • Research
  • Team

Categories

  • Assembly Topics
  • Book Chapters
  • Conference Proceedings
  • Flexible Flowline Data Repository
  • Metaheuristics
  • News
  • Presentations
  • Publications
  • Refereed Journal Publications
  • Research
  • Scheduling Topics
  • Uncategorized

Archive

  • August 2026
  • January 2026
  • March 2025
  • June 2023
  • December 2021
  • September 2021
  • June 2021
  • May 2021
  • December 2019
  • January 2019
industrial engineering

Map

Dr. Mary E. Kurz
Associate Professor
Department of Industrial Engineering
Clemson University
mkurz@clemson.edu

© Copyright Dr. Mary E Kurz. All Rights Reserved. Site by Academic Web Pages
    • Login
    Scroll to top Scroll to top Scroll to top