Dr. Mary E. Kurz
  • Home
  • Bio
  • Team
  • Research
  • Publications
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Scheduling Topics

Random keys implementation of NSGA-II for semiconductor manufacturing scheduling

Mason, S.J., Kurz, M.E., Pohl, L.M., Fowler, J.W., Pfund, M.E., 2007, “Random keys implementation of NSGA-II for semiconductor manufacturing scheduling”, International Journal of Information Technology and Intelligent Computing, 2(3).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2007-05-01 00:00:002021-06-21 20:01:48Random keys implementation of NSGA-II for semiconductor manufacturing scheduling

Multiobjective single machine scheduling with nontraditional requirements

Haral, U., R-W Chen, W. Ferrell, Jr., M. Kurz. “Multiobjective single machine scheduling with nontraditional requirements.” International Journal of Production Economics. Vol. 106, No. 2, April 2007, 574-584.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2007-04-01 00:00:002021-06-21 20:01:20Multiobjective single machine scheduling with nontraditional requirements

A branch and bound algorithm to minimize total weighted tardiness on a parallel-batch processing machine with ready times and incompatible job families

Tangudu, Sarat and Mary E. Kurz. “A branch and bound algorithm to minimize total weighted tardiness on a parallel-batch processing machine with ready times and incompatible job families.” Production Planning and Control. Vol. 17, No. 7, October 2006, 728-741.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2006-10-01 00:00:002021-06-21 20:00:27A branch and bound algorithm to minimize total weighted tardiness on a parallel-batch processing machine with ready times and incompatible job families

A Genetic Algorithm for the Earliness/Tardiness Flow Shop Scheduling Problem

Randall, Robert and Mary E. Kurz. “A Genetic Algorithm for the Earliness/Tardiness Flow Shop Scheduling Problem.” Industrial Engineering Research Conference Proceedings 2006, Orlando FL (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2006-06-23 00:00:002021-06-21 20:28:31A Genetic Algorithm for the Earliness/Tardiness Flow Shop Scheduling Problem

Serial Batch Scheduling using an Adaptive Crossover Selection Genetic Algorithm

Randall, Patricia and Mary E. Kurz. “Serial Batch Scheduling using an Adaptive Crossover Selection Genetic Algorithm.” Industrial Engineering Research Conference Proceedings 2006, Orlando FL (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2006-06-23 00:00:002021-06-21 20:29:10Serial Batch Scheduling using an Adaptive Crossover Selection Genetic Algorithm

Extensions of Genetic Algorithms Demonstrated in Scheduling Problems

Kurz, Mary E. (presenter), Srinivas Anandan and Sarah Canterbury. “Extensions of Genetic Algorithms Demonstrated in Scheduling Problems.” November 15, 2005. INFORMS 2005 Conference, San Francisco, CA.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2005-11-15 00:00:002021-06-21 20:51:23Extensions of Genetic Algorithms Demonstrated in Scheduling Problems

Genetic Algorithm to Minimize Earliness and Tardiness of Outbound Trains in a Rail Yard

Randall, Robert (presenter), Mary E. Kurz . “Genetic Algorithm to Minimize Earliness and Tardiness of Outbound Trains in a Rail Yard.” November 13, 2005. INFORMS 2005 Conference, San Francisco, CA.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2005-11-13 00:00:002021-06-21 20:51:51Genetic Algorithm to Minimize Earliness and Tardiness of Outbound Trains in a Rail Yard

Scheduling Unrelated Parallel Machines using a Random Keys Genetic Algorithm

Randall, Patricia and Mary E Kurz. “Scheduling Unrelated Parallel Machines using a Random Keys Genetic Algorithm.” Industrial Engineering Research Conference Proceedings 2005, Atlanta GA (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2005-06-23 00:00:002021-06-21 20:30:42Scheduling Unrelated Parallel Machines using a Random Keys Genetic Algorithm

A MIP Model to Improve Locomotive Engineers Schedules

Randall, Robert and Mary E Kurz. “A MIP Model to Improve Locomotive Engineers Schedules.” Industrial Engineering Research Conference Proceedings 2005, Atlanta GA (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2005-06-23 00:00:002021-06-21 20:30:59A MIP Model to Improve Locomotive Engineers Schedules

Minimizing total flowtime and maximum earliness on a single machine using multiple measures of fitness

Kurz, M.E. and Canterbury, S. “Minimizing total flowtime and maximum earliness on a single machine using multiple measures of fitness,” Proceedings of the 2005 Genetic and Evolutionary Computation Conference (GECCO-2005), 803-809.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2005-06-23 00:00:002021-06-21 20:29:26Minimizing total flowtime and maximum earliness on a single machine using multiple measures of fitness
Page 2 of 41234

Pages

  • Bio
  • Home
  • Publications
  • Research
  • Team

Categories

  • Assembly Topics
  • Book Chapters
  • Conference Proceedings
  • Flexible Flowline Data Repository
  • Metaheuristics
  • News
  • Presentations
  • Publications
  • Refereed Journal Publications
  • Research
  • Scheduling Topics
  • Uncategorized

Archive

  • August 2026
  • January 2026
  • March 2025
  • June 2023
  • December 2021
  • September 2021
  • June 2021
  • May 2021
  • December 2019
  • January 2019
industrial engineering

Map

Dr. Mary E. Kurz
Associate Professor
Department of Industrial Engineering
Clemson University
mkurz@clemson.edu

© Copyright Dr. Mary E Kurz. All Rights Reserved. Site by Academic Web Pages
    • Login
    Scroll to top Scroll to top Scroll to top