Dr. Mary E. Kurz
  • Home
  • Bio
  • Team
  • Research
  • Publications
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Scheduling Topics

The Need for a Model of Rail Operations to Improve Engineer Schedules

Randall, Robert (presenter), Mary E. Kurz, June J. Pilcher. “The Need for a Model of Rail Operations to Improve Engineer Schedules.” October 20, 2003. INFORMS 2003 Conference, Atlanta GA.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2003-10-20 00:00:002021-06-21 20:53:07The Need for a Model of Rail Operations to Improve Engineer Schedules

On the Structure of Optimal Schedules for Minimizing Total Weighted Tardiness on Parallel, Batch-Processing Machines

Kurz, Mary E. “On the Structure of Optimal Schedules for Minimizing Total Weighted Tardiness on Parallel, Batch-Processing Machines.” Industrial Engineering Research Conference Proceedings 2003, Portland OR (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2003-06-23 00:00:002021-06-21 20:32:39On the Structure of Optimal Schedules for Minimizing Total Weighted Tardiness on Parallel, Batch-Processing Machines

Applying a Random Keys Genetic Algorithm to Bicriteria Single Machine Scheduling

Kurz, Mary E. and William G. Ferrell, Jr. “Applying a Random Keys Genetic Algorithm to Bicriteria Single Machine Scheduling.” Industrial Engineering Research Conference Proceedings 2003, Portland OR (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2003-06-23 00:00:002021-06-21 20:33:02Applying a Random Keys Genetic Algorithm to Bicriteria Single Machine Scheduling

Multiobjective Scheduling with Nonregular Objectives

Koppuraviuri, V., W.G. Ferrell, Jr., and M.E. Kurz. “Multiobjective Scheduling with Nonregular Objectives.” Proceedings of the 31 st International Conference on Computers and Industrial Engineering, San Francisco, CA (http://www.umoncton.ca/cie/Conferences/31thconf/31stICCIE/Papers/p89.pdf).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2003-06-23 00:00:002021-06-21 20:33:24Multiobjective Scheduling with Nonregular Objectives

Heuristic scheduling of parallel machines with sequence-dependent setup times

Kurz, Mary E. and Ronald G. Askin. “Heuristic scheduling of parallel machines with sequence-dependent setup times.” International Journal of Production Research, Vol. 39, No. 16, November 2001, 3747-3769.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-11-01 00:00:002021-06-21 19:57:41Heuristic scheduling of parallel machines with sequence-dependent setup times

Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines

Askin, Ronald G. and Mary E. Kurz. “Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines.” July 30, 2001. International Conference on Production Research, Prague, Czech Republic.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-07-30 00:00:002021-06-21 20:35:21Strategies for Scheduling Flexible Flow Lines with Sequence Dependent Setups and Parallel Machines

Scheduling Flexible Flow Lines with Sequence-dependent Setup Times

Kurz, Mary E. and Ronald G. Askin. “Scheduling Flexible Flow Lines with Sequence-dependent Setup Times.” Industrial Engineering Research Conference Proceedings 2001, Dallas TX (CD-ROM).

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages2001-06-23 00:00:002021-06-21 20:34:42Scheduling Flexible Flow Lines with Sequence-dependent Setup Times

Parallel Machine Scheduling with Sequence-Dependent Setup Times

Kurz, Mary E. (presenter) and Ronald G. Askin. “Parallel Machine Scheduling with Sequence-Dependent Setup Times.” November 8, 1999. INFORMS Fall 1999 Conference, Philadelphia PA.

/wp-content/themes/awp-enfold/blank.png 0 0 Academic Web Pages /wp-content/themes/awp-enfold/blank.png Academic Web Pages1999-11-08 00:00:002021-06-21 20:55:51Parallel Machine Scheduling with Sequence-Dependent Setup Times
Page 4 of 41234

Pages

  • Bio
  • Home
  • Publications
  • Research
  • Team

Categories

  • Assembly Topics
  • Book Chapters
  • Conference Proceedings
  • Flexible Flowline Data Repository
  • Metaheuristics
  • News
  • Presentations
  • Publications
  • Refereed Journal Publications
  • Research
  • Scheduling Topics
  • Uncategorized

Archive

  • August 2026
  • January 2026
  • March 2025
  • June 2023
  • December 2021
  • September 2021
  • June 2021
  • May 2021
  • December 2019
  • January 2019
industrial engineering

Map

Dr. Mary E. Kurz
Associate Professor
Department of Industrial Engineering
Clemson University
mkurz@clemson.edu

© Copyright Dr. Mary E Kurz. All Rights Reserved. Site by Academic Web Pages
    • Login
    Scroll to top Scroll to top Scroll to top