Minimizing Makespan and Number of Tardy Jobs on a Flexible Flowshop with Unrelated Machines

Publication Year: 2010
.

Kurz, M.B., S. Badrinayaranan (presenter), “Minimizing Makespan and Number of Tardy Jobs on a Flexible Flowshop with Unrelated Machines”, INFORMS 2010 Conference, Austin, TX.